Measuring Up
Finding the right model is very simple, all you have to do is measure the actual aperture of the meter box (with the door open) – you will probably find that it matches one of our standard sizes, if not please call us with details.

Installation
Follow the simple guide below for easy installation.

Step 1   Step 2   Step 3   Step 4
     
Remove the existing plastic door. Unless the interior has been vandalised, damage to remaining plastic frame need not be repaired.   The new meter box frame should then be manoeuvred into position. It will fit over the top of the existing frame providing further protection to the elements and damage.   Using the ready drilled metal tabs attached to the frame, secure to the walls of the existing cabinet by self tapping screws. You will not need to drill brickwork.   Close and lock the door and the job is complete. Even using inexperienced labour, replacement can be completed within 10 minutes.
 

To place an order call tel. 01453 827661
fax. 01453 824094
between 9am & 5pm Monday to Friday.

 

 

 
 

Copyright © 2007 MeterBox.co.uk
The MeterBox web site is designed and produced by Petersen Creative, Cheltenham. www.petersencreative.com